Photo Gallery

Lisheen Mine January 2018

Two retained buildings that will be part of the Bio-economy Campus.  Area is brown is all fully rehabilitated and ready for redevelopment of the site
Final section of TMF to be capped with engineered wetlands in the distance
Turbine located in Borrow Pit at Carrick Hill fully re-watered
Final section of TMF to be capped
Final section of TMF to be capped.  Main spillway from TMF can be seen in the photo to the left
TMF rehabilitation approaching completion, engineered wetlands and site to the left of the photo
Borrow Pit at Carrick Hill fully re-watered
Foreground, conditioning ponds removed, TMF in the background
Final section of TMF to be capped with engineered wetlands in the distance
Borrow Pit at Carrick Hill fully re-watered
Aerial Borrow Pit at Carrick Hill fully re-watered

Lisheen Mine 2017

/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize

Lisheen Mine 2016

/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize/fullsize