Suppliers

Ageing Pond Request For Information


 Black Mountain
Category:
Other
Ending in
Tender expired
Issued:
2021-11-11 08:00 AM
Closing:
2021-11-18 04:00 PM
Files:
Login required to download
Black Mountain has one ageing pond and two sill traps that are next to each other. Requirement is for proposals and methods to clean the two sill traps and reclaim approximately 8000 MT of Zinc concentrate from the ageing pond without hampering on-going plant operations and damaging the plastic liners. Final product having maximum of 20% moisture content for further drying in shed. There is no other pond available to transfer pond material from plant operations hence this have to be performed without hampering on-going plant operations. Request for proposal for most efficient and cost effective methods within the shortest lead time possible. Any queries to be submitted on the website.
Tender expired

Log in to read and send messages